Equipment Procurement

Procuring the right equipment is one of the most critical stages in energy project development. For digital infrastructure clients, the decisions made during procurement directly affect power quality, reliability, and deployment timelines. We provide equipment procurement services that are tightly aligned with technical requirements, commercial goals, and long-term operational expectations.

Our focus is on sourcing, evaluating, and securing the components that will define the success of your power and fuel infrastructure—whether for onsite generation, grid interfacing, thermal recovery, or storage integration.

How We Help You Deliver with Confidence

Technology Alignment and Vendor Selection

We begin by aligning equipment specifications with the needs of the data centre facility. This includes selecting generation technologies that support the desired load profile, redundancy level, emissions targets, and uptime requirements. We evaluate multiple vendors and technologies including reciprocating engines, gas turbines, battery storage systems, switchgear, transformers, and thermal systems.


Procurement Strategy and Tendering

We structure competitive procurement processes based on clear technical specifications and delivery criteria. This includes issuing requests for quotation or proposal, evaluating bids, facilitating vendor discussions, and supporting final selection based on lifecycle cost, performance and delivery certainty. We tailor the process to the commercial model in place, whether design-build, EPC, or owner-led execution.


Lead Time and Schedule Integration

We manage procurement timelines to align with construction and commissioning schedules. Our team tracks manufacturing lead times, shipment logistics, and staging requirements to ensure critical path items are available when needed. We provide early identification of long-lead components such as generators, pressure vessels, high-voltage breakers and specialty instrumentation.


Contract Negotiation and Technical Review

We support the negotiation of supply agreements, warranties, service contracts, and performance guarantees. Technical due diligence is performed to confirm that all equipment meets applicable standards, interoperability requirements and local utility interconnection specifications.


Factory Oversight and Quality Assurance

Where required, we coordinate factory acceptance testing, witness inspections, and milestone tracking to ensure equipment is built to specification and on schedule. We also review quality documentation and logistics plans for site delivery.


Balance-of-Plant Coordination

We procure auxiliary equipment including pumps, radiators, piping systems, electrical enclosures, and controls. This ensures full compatibility across the plant and reduces integration risk during commissioning. We also coordinate with the engineering team to match vendor drawings with site conditions.


Built for Resiliency and Future Expansion

Our procurement approach is designed to support not only current load demands but future scalability. We source modular and expandable equipment where possible to support growth in compute density, additional halls, or evolving energy strategies.